Things to do · Clarington, Ontario
Published
The old Bowmanville Zoo lands are finally somewhere to take a walk
Bowmanville Park’s first trails opened in August 2026 on the former zoo lands. The 13.7-hectare park includes about 700 metres of initial paths, with an asphalt main trail and crushed-limestone secondary routes. Access is through Mearns Park or near King Street East and Mearns Avenue; wider features are still planned.
Facts checked
In this story

A future park gets a present tense
For years, the former Bowmanville Zoo lands were the kind of place discussed using “eventually”. In August 2026, Clarington opened the first trails at Bowmanville Park. Eventually now includes somewhere to put your feet.
The change is deliberately less dramatic than reopening an attraction. This is a 13.7-hectare public park beginning a new life, with about 700 metres of initial paths and a larger plan still ahead. A walk is the first invitation, not a promise that every drawing has become a facility.
Source: August 2026 trails opening
Source: 2024 design vision
Source: May 2026 groundbreaking
Source: Clarington’s first outdoor rink opens, more on the way
The first visit has a modest purpose
The main trail is accessible asphalt, with secondary crushed-limestone routes. Northern access is through Mearns Park; southern access is described near King Street East and Mearns Avenue. Follow current marked paths rather than making an expedition out of finding a route that is not open.
Dedicated parking was anticipated as development continues. The initial stage suits a short exploration better than a day built around a fully equipped destination. Knowing that does not reduce the opening’s value; it prevents a perfectly reasonable walk being blamed for failing to be an entire attraction.
Source: August 2026 trails opening
Source: 2024 design vision
Source: May 2026 groundbreaking
Source: Clarington’s first outdoor rink opens, more on the way
The waiting was part of the local story
A January 2025 contributor discussing Durham recreation pointed to the zoo lands as a place that never seemed to open. It was a pointed example of how a long plan can become shorthand for frustration.
The first paths change that answer. Repeating the complaint unchanged would miss the progress, while declaring the whole park complete would miss the reason people still want details. The present sits between those two easy versions: public use has begun, and more remains to do.
Source: August 2026 trails opening
Source: 2024 design vision
Source: May 2026 groundbreaking
Source: Clarington’s first outdoor rink opens, more on the way
A plan made in stages
Council approved the design vision in 2024, and trail construction began in May 2026. Clarington and Valleys 2000 describe a longer undertaking that builds on the landscape and its history, with play, performance and gathering ideas beyond this opening.
Each addition will need its own funding and work. A master plan is useful for showing how things might fit together, but notoriously poor at providing a bench to somebody whose legs are tired. The actual stages will matter to actual visits.
Source: August 2026 trails opening
Source: 2024 design vision
Source: May 2026 groundbreaking
Source: Clarington’s first outdoor rink opens, more on the way
A different reason to know the place
The park’s past will remain part of its identity without requiring the new landscape to recreate every old attraction. Its future may be established through something quieter: a route people use regularly, a pause in the neighbourhood and reasons to return.
For now, choose the walk that exists. Watch later proposals through the needs of an ordinary visit, rather than the most spectacular rendering. Bowmanville has gained the beginning of a usable public place, and a beginning is better company on a walk than “eventually”.
Source: August 2026 trails opening
Source: 2024 design vision
Source: May 2026 groundbreaking
Source: Clarington’s first outdoor rink opens, more on the way
Place details and map
Bowmanville Park, former zoo lands
South trail entrance near King Street East and Mearns Avenue, Bowmanville, Ontario
First-phase public pathways through the former zoo lands. The full master plan is not complete. Dedicated parking is anticipated in later phases. Use the signed open trails.
Source: August 2026 trails opening
Source: August 2026 trails opening
More place details
Source: Compare these places in Resources
Source: Clarington’s first outdoor rink opens, more on the way
Questions people ask
Has the former Bowmanville Zoo reopened?
No. This project is a public park on the former zoo lands.
Source: August 2026 trails opening
Are any trails open?
Yes. Clarington announced the first trail phase in August 2026, including a main asphalt trail and secondary crushed-limestone paths.
Source: August 2026 trails opening
How big is the municipal park?
The municipal opening notice describes a 13.7-hectare park on the former zoo lands.
Source: August 2026 trails opening
When did council approve the design vision?
Council approved the master-plan vision in 2024, before trail construction began in May 2026.
Source: August 2026 trails opening
How long are the first trails at Bowmanville Park?
Clarington announced about 700 metres in the first trail phase.
Source: August 2026 trails opening
What surfaces do the Bowmanville Park trails have?
The first phase includes an accessible asphalt main trail and secondary crushed-limestone paths.
Source: August 2026 trails opening
Who is working with the municipality?
The opening notice identifies Valleys 2000 as a partner.
Source: August 2026 trails opening
Where is northern trail access described?
The municipality describes northern access through Mearns Park.
Source: August 2026 trails opening
Where is southern access described?
Southern access is described near King Street East and Mearns Avenue.
Source: August 2026 trails opening
Is there dedicated parking at the new Bowmanville Park?
The August opening announcement says designated parking is anticipated as the park develops. The stated walking entrances are through Mearns Park or near King Street East and Mearns Avenue.
Source: August 2026 trails opening
Something changed? Tell us about a correction.